I am working on my kegerator and I have the CO2 done (three way manifold)
now I am looking for ideas for the taps. What do you think of Perlick and the Vent-Matic both SS. I will use 7' of 3/16 line for all three taps. The kegerator should fit six cornys (with some mods to the inside of the door).
thanks for any input.
now I am looking for ideas for the taps. What do you think of Perlick and the Vent-Matic both SS. I will use 7' of 3/16 line for all three taps. The kegerator should fit six cornys (with some mods to the inside of the door).
thanks for any input.