ThatsMyBeer
Member
So I have been contemplating posting my build for some time. Not that I didn't want to show it off, it's just not done yet. I figure I have another $600 to invest before I can call it done. Pumps, transfer tubing, connectors, false bottom and little things like that. If you think about it "Is it ever really done?" Probably not.
Any way here it is. I will give a brief description of my thought process of each picture since I can't seem to be able to figure out how to insert text between pics.
#1
I really like the B3 single tier so I modeled my build after it, but with my spin on it.
#2
Close up of my control panel. The panel is hinged to open. I wired a separate switch to operate the lower pump outlet for my transfer pump. I did not like the idea of needing to plug and unplug the pump for operation.
#3 & 4
Please forgive the wiring mess here. This is the result of not being able to find a wiring schematic online so what you see is all my R & D wiring. I will be going through the mess and make it more presentable after my first test run.
#5
This is one of the spins I mentioned. I added a fourth burner. The thought would be while boiling the previously made wort I could start a second batch and transfer to a second kettle or maybe a five gallon extract at the same time. It could double a shelf as well.
I have more pics, just can't put more then 5 so I hope to reply to my thread and continue.
Any way here it is. I will give a brief description of my thought process of each picture since I can't seem to be able to figure out how to insert text between pics.
#1
I really like the B3 single tier so I modeled my build after it, but with my spin on it.
#2
Close up of my control panel. The panel is hinged to open. I wired a separate switch to operate the lower pump outlet for my transfer pump. I did not like the idea of needing to plug and unplug the pump for operation.
#3 & 4
Please forgive the wiring mess here. This is the result of not being able to find a wiring schematic online so what you see is all my R & D wiring. I will be going through the mess and make it more presentable after my first test run.
#5
This is one of the spins I mentioned. I added a fourth burner. The thought would be while boiling the previously made wort I could start a second batch and transfer to a second kettle or maybe a five gallon extract at the same time. It could double a shelf as well.
I have more pics, just can't put more then 5 so I hope to reply to my thread and continue.