Ravenshead
Well-Known Member
This may be posted but I can't find it.
I just received an Mypin TA4 -SNR PID and the associated SSR and thermocouple. I know how to use it for strike water and mash temp based on the temp, but how do I control the duty cycle during the boil? I see something call manual mode for other PIDs but the instructions that came with mine don't mention such a mode.
I just received an Mypin TA4 -SNR PID and the associated SSR and thermocouple. I know how to use it for strike water and mash temp based on the temp, but how do I control the duty cycle during the boil? I see something call manual mode for other PIDs but the instructions that came with mine don't mention such a mode.