Hey all,
Just about to get the bits together for a cheap mash tun to get me into AG fully. I read about the Zapap bucket in a bucket and originally was going to go for this until I read some more and saw a lot of people dislike it.
So I thought I would take one of my 20 litre buckets/fermeters drill a hole in the side at the bottom and use this on the inside
screwed into a ball valve on the outside. I will be batch sparging. Does anyone see any glaring holes in my plan? Am I setting myself up for failure or will this work?
Anyone that wants to suggest a PVC/copper manifold or SS braid please do more than a "use a braid/manifold" post
Cheers
Just about to get the bits together for a cheap mash tun to get me into AG fully. I read about the Zapap bucket in a bucket and originally was going to go for this until I read some more and saw a lot of people dislike it.
So I thought I would take one of my 20 litre buckets/fermeters drill a hole in the side at the bottom and use this on the inside
Anyone that wants to suggest a PVC/copper manifold or SS braid please do more than a "use a braid/manifold" post
Cheers