I'm taking the plunge and designing my brew rig. I using the SS shelving from Lowes.
5-Tier Chrome Tower Shelving Unit
I saw booths rig in the sculpture thread and really liked the idea. I'm gonna use 2 of them to make a 3 tier rig.
Here's where I need some help. I need a schematic of the propane plumbing to feed the 2 burners that are going to be used. 20 psi. The plumbing will be mounted on the rig.
I am also delving into uncharted territory, at least for me, of using a mounted chiller and pump. This will be limited to chilling the wort and moving it into the fermentor. I am interested in using a plate chiller at this point.
I just need a drawing or something to show the components and where they go in the circuit. Is this making any sense at all?
Also, is it best to filter before the fermentor or should that really be done keg to keg?
Thanks
Karma
5-Tier Chrome Tower Shelving Unit
I saw booths rig in the sculpture thread and really liked the idea. I'm gonna use 2 of them to make a 3 tier rig.
Here's where I need some help. I need a schematic of the propane plumbing to feed the 2 burners that are going to be used. 20 psi. The plumbing will be mounted on the rig.
I am also delving into uncharted territory, at least for me, of using a mounted chiller and pump. This will be limited to chilling the wort and moving it into the fermentor. I am interested in using a plate chiller at this point.
I just need a drawing or something to show the components and where they go in the circuit. Is this making any sense at all?
Also, is it best to filter before the fermentor or should that really be done keg to keg?
Thanks
Karma