agezzi
Well-Known Member
For about 6months now I've been looking around matching prices and finding as much free stuff as possible to start me a Brutus. Well she's not together yet, but I wanted to share so far what I have. I know I came in under a grand. When I sit down and add up all the receipts I'll post them on here , and try as well to take pics of the build if wanted. My goal was to build her on a budget and I think I didn't do to bad. I still need to get gas plumbing, but will wait to build the fame first. Then go buy alot of random sizes to get it plumbed. And before u ask the two yellow ball valves up front are just mockups. I will make the tubing longer when I get these pilots plumbed. The 2nd pic is of one of the kegs(I have 2 more to do) and the last pic is the angle iron and Cloey. Any thoughts?