tkone
Well-Known Member
- Joined
- Jan 19, 2009
- Messages
- 153
- Reaction score
- 0
so i finally got the holes drilled and the element wired and capped off and sealed and i know i need to ground it to the pot, but what's the best way to do this?
ideally i'd like to be able to still remove the element easily but am up for anything. was thinking just to jb weld it to the side, but i thought that might look a little ugly.
should i just drill another hole and use some stainless steel machine screws and very small o-rings?
here's a pic if you want something visual. i still need to sand down the excess jb weld. maybe. or i just want to start a-brewin'
oh, and awesomely? no leaks. not a single flippin' drip out of any of the ports. and the copper dip tube just arrived...
i might even be able to break this bad boy in this weekend.
ideally i'd like to be able to still remove the element easily but am up for anything. was thinking just to jb weld it to the side, but i thought that might look a little ugly.
should i just drill another hole and use some stainless steel machine screws and very small o-rings?
here's a pic if you want something visual. i still need to sand down the excess jb weld. maybe. or i just want to start a-brewin'
oh, and awesomely? no leaks. not a single flippin' drip out of any of the ports. and the copper dip tube just arrived...
i might even be able to break this bad boy in this weekend.