Hi there
I already have a thread on the brewtroller forum, but I thought that a thread here would work as well.
We are a group of 6 people building a brewery capable of producing 60l batches. Its a single tier, 3 vessel HERMS based system. Pumps, valves and heating is controlled by brewtroller.
First off, a P&I diagram.
All valves and pumps is connected with 1/2" silicone hose, so it should be pretty easy to accommondate future changes.
A picture of the stand, to give an idea of the overall size
A picture of the newly welded vessels
Lastly a picture of a temperary setup I made to test the heating element with PID control
More pictures in my picasa album https://picasaweb.google.com/jacobguldberg/Brewery#
I already have a thread on the brewtroller forum, but I thought that a thread here would work as well.
We are a group of 6 people building a brewery capable of producing 60l batches. Its a single tier, 3 vessel HERMS based system. Pumps, valves and heating is controlled by brewtroller.
First off, a P&I diagram.
All valves and pumps is connected with 1/2" silicone hose, so it should be pretty easy to accommondate future changes.
A picture of the stand, to give an idea of the overall size
A picture of the newly welded vessels
Lastly a picture of a temperary setup I made to test the heating element with PID control
More pictures in my picasa album https://picasaweb.google.com/jacobguldberg/Brewery#