Search results

Homebrew Talk - Beer, Wine, Mead, & Cider Brewing Discussion Forum

Help Support Homebrew Talk - Beer, Wine, Mead, & Cider Brewing Discussion Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. cheez

    Need examples of wire/cable runs on brew stand

    I am on the last leg of my Stout Tanks 50-amp control panel build (see build thread here - https://www.homebrewtalk.com/f170/e-herms-build-50-amp-393717/) I am having a tough time figuring out how to run the two element power cables, two pump power cables, and the three RTD sensor cables from...
  2. cheez

    Signs Banners & Tags - still in business?

    I sent them a request for a quote just over a week ago, I tried calling them on Friday and got what sounded like a non-business voicemail greeting, and I sent them an email this morning. I've seen a couple of forums where people were praising how quickly they returned calls/emails. Does...
  3. cheez

    Help with relay wiring for safe start interlock

    I need help wiring this relay I got from Automation Direct. It did not come with any instructions other than a basic wiring diagram. I tried to reference it to other relays that others have used but I want to make sure it's right before sending 110 volts of juice through it. This is the...
  4. cheez

    Maker's Mark Bourbon - free bottle!

    I am a member of their Ambassador Club and have had my name on a barrel of bourbon for about the last 6 years or so. I now have the opportunity to purchase two bottles with my name on it. The crappy part is I live in Washington State and, due to Kentucky laws, they will not ship me the...
  5. cheez

    Control Panel Brew Stand Mount

    I would like to attach my 16x16x8 50A control panel to the side of my wood brew stand and have the ability of swiveling it out of the way when done brewing. I would also like to be able able to move the height of the panel up without attaching a vertical 2x4 (or whatever) to the side of my brew...
  6. cheez

    E-Herms Build 50 amp

    I have a MT, BK, and HLT on order from Stout Tanks and they are due in May. I am trying to get a jump start on the control panel build because once the kettles get here... I want to brew! I will be building a 6'L x 2.5'D x 2'H wood brew stand this weekend. It's similar to Kal's and a few...
  7. cheez

    Requesting control panel layout input

    I just placed an order with Stout Tanks for a 1/2 barrel setup and I'm in the process of gathering all of the parts and pieces for a 50-amp PID back-to-back brewing system. I'll probably order a modified kit from ebrewsupply, get the Aubers PID's, timers, and deluxe RTD probes, and get a...
  8. cheez

    Pre & Post Boil Gravity readings nearly identical

    First post.... :) I just made my third all grain batch yesterday (using rubbermaid coolers for the HLT & Mash Tun and a converted keg for the kettle). The OG pre boil and the OG post boil readings have been nearly identical on each separate batch. I know it is impossible since there is...
Back
Top