I actually posted on another thread but have since decided that I want to go ahead and run a 50a/120v/240v to my brewing area. I am currently undergoing a lot of brewery upgrades and just converted from cooler HLT & mash tun to a 3 keggle system. I am looking to put together a control panel...
I am trying to add some additional ball valves in order to upgrade my setup with pumps and a HERMS coil, etc.... I can't find anything online about the best way to add a bulkhead through the portion of the cooler with the thicker double wall.. see image, I was able to get the inside shell bored...