I have a partially completed Control Box for an Electric Brewery. The box has all the PID's, the timer, the Volt and Watt meters, all the switches, all the indicator lights, and the alarm. I also have the SSR's and the heat sinks. The bottom receptacles are also installed. There is no wiring...