I got my summit double kegerator, and will be installing it under my bar that I am building. The run from the tower on top of the bar to the kegerator will be about a foot or so. I went out and bought some pvc and some pipe insulation. Is this the right way to do it or is their an easier and...
Irregular...
thanks!
Also, next question..
My tower from my kegerator (summit dual tap) is currently attached to my kegerator... I want it to be about a foot from the kegerator (I want it on the bar top). Since its a short run, what is the best solution to run the lines through? Can you...
Hi,
I am in the process of building my bar, and I have a few questions..
First, I will be protecting it with a epoxy top... Ill probably be snagging the following ...