I've been working this 1.5bbl system(pictures above), and I've finally got all the plumbing done, valves hooked up, and ready to go... or so I thought.
It's a single tier, 3 burner system, with the HLT and mash tun controlled with honeywell valves. Here's the setup from tank to burner.
A 500K...