Recent content by rbstryker

Homebrew Talk - Beer, Wine, Mead, & Cider Brewing Discussion Forum

Help Support Homebrew Talk - Beer, Wine, Mead, & Cider Brewing Discussion Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. rbstryker

    Another brew stand - 10 months in the making

    I was fortunate enough to have a good friend who's a fabricating master. Befriend someone who likes beer/fab work?
  2. rbstryker

    Another brew stand - 10 months in the making

    Hey, thanks for the support! I think Beer at a Time is fresh out of our beer at the moment. NW Liquid gold off Fourth Plain might be your only bet at getting some (they have one of the last kegs, until we keg up what we last brewed). Next couple weeks you should see our Porter and Malice...
  3. rbstryker

    Cheers from Vancouver, WA.

    Heyo Vancouver! There is a homebrew club here in Vancouver, but I just moved over from Portland about a year ago and haven't checked it out. I want to say it's Plato Republic? Got real busy with the brewery and haven't had time to check it out. Cheers!
  4. rbstryker

    Another brew stand - 10 months in the making

    No worries at all, just shoot me a PM and we can set something up.
  5. rbstryker

    Another brew stand - 10 months in the making

    Temp controllers are these: 110V, F display. Thermometer for the chiller is this: 110V, F display. Timer is this: 115V supply. I have a schematic, but a lot of it I shot from the hip when I added things. Send me a PM if you're interested and I'll see what I can work up. Most of it, I got...
  6. rbstryker

    Another brew stand - 10 months in the making

    Got the chiller mounted last night. Yes, I am aware that it won't drain the way that it's mounted. The idea behind the way it is, was so that it would be protected from being bonked or knocked around when the stand is being pulled out, etc. Another reason was so that the temp probe cable...
  7. rbstryker

    Another brew stand - 10 months in the making

    I'm afraid to work it up. A lot of the raw material I was fortunate enough to source through work for cheap. Some of it I had on hand. For the most part, the expensive stuff was in all of the smaller components. That stuff adds up fast, and if you don't have a plan going into it, it can...
  8. rbstryker

    Another brew stand - 10 months in the making

    Sourced them locally in the Portland area, but they're the same as the needle valves on this page. P/N: 850-BRF-SP
  9. rbstryker

    Another brew stand - 10 months in the making

    HLT done with HERMS coil inside. Everything on the tubing is Swagelock.
  10. rbstryker

    Another brew stand - 10 months in the making

    Stainless braid that is wrapped around the silicone tubing.
  11. rbstryker

    Another brew stand - 10 months in the making

    Some photos of the new panel tags that just came in.
  12. rbstryker

    Another brew stand - 10 months in the making

    BK is done now.
  13. rbstryker

    Another brew stand - 10 months in the making

    Got the HERMS coil in place, hoses are made up, and everything is done. More pictures of that to come tonight. I have a few more hoses to make, and I'll post pictures of those tonight as well. I wrapped the 1/2" silicone tubing with some 3/8" (stretched, it's like a Chinese finger trap)...
  14. rbstryker

    Another brew stand - 10 months in the making

    Here's the setup. It's the same on all three of the burners, with the exception of the BK line not having a solenoid. It's extremely nice because when another burner goes on or off, the remaining burners do not change in pressure at all. Everything stays constant.
  15. rbstryker

    Another brew stand - 10 months in the making

    Mash tun port for recirculating and sparge arm hook up.
Back
Top