baldm79
Well-Known Member
I have a bit of a dilemma, and I figured there must be a few million other brewers who have had similar issues.
I’m in the process of switching out equipment to be able to brew 10-15 gallons. Which means I’m constantly taking things apart and trying different fittings on different pieces of equipment. I work full time and am a full time student, so much like everyone else here I can’t brew as often as I’d like. So my question is this, how do you go about upgrading things? All at once? Or slowly piece it together? And how the hell do you keep anything in the pipeline while you do it?!
Any opinions or ideas appreciated for the education of those of us who aren’t engineers or generally handy
I’m in the process of switching out equipment to be able to brew 10-15 gallons. Which means I’m constantly taking things apart and trying different fittings on different pieces of equipment. I work full time and am a full time student, so much like everyone else here I can’t brew as often as I’d like. So my question is this, how do you go about upgrading things? All at once? Or slowly piece it together? And how the hell do you keep anything in the pipeline while you do it?!
Any opinions or ideas appreciated for the education of those of us who aren’t engineers or generally handy