dthompson79
Well-Known Member
- Joined
- Jan 21, 2016
- Messages
- 147
- Reaction score
- 46
The jacket material is on order. We are finalizing designs with our local manufacturer as well as wrapping up testing with outside labs. We understand it can be frustrating waiting for new products however it is our company goal to produce the highest quality products you can buy. Unfortunately this takes time to develop and test to get to our high quality standard. We release new product details well in advance so people know what's on the horizon and can start saving, planning, etc. If this causes more harm than good we might need to re-look at that strategy.
Honestly I get it. the strategy isn't a bad one. The constant missed promise dates are what makes it infuriating. I would say if you are going to change something change your level of optimism in your supply chains expediency. I have no problem waiting six months for something I want. Its when its promised in 3 and then takes 6 that raises my ire.
On a happy note I have about 6 or 7 batches through my CF10 and love it. Excellent build quality. I don't regret waiting.