nickdaniel
Member
I'm trying to put together a RIMS system but have run into a problem connecting a few of my parts.
I've got this PID kit: http://www.thermomart.com/beer-brewing -kit
and this RIMS tube: http://www.brewhardware.com/rimsherms-parts/169-newrims
The RIMS tube is drilled and tapped as 1/2" female NPT. The temp probe that comes with the PID kit has M8 threads.
Anyone have any idea how I can connect these and still ensure it's liquid tight?
I've got this PID kit: http://www.thermomart.com/beer-brewing -kit
and this RIMS tube: http://www.brewhardware.com/rimsherms-parts/169-newrims
The RIMS tube is drilled and tapped as 1/2" female NPT. The temp probe that comes with the PID kit has M8 threads.
Anyone have any idea how I can connect these and still ensure it's liquid tight?