Hi all,
New to electric brewing but not electricity.
I am using Doug's diagram below on my build.
The SW11's in this diagram are 120volt (not 240) correct? Just double checking - as the switches are taking in a neutral and hot on the lighted indicator but passing through two separated hots on the switch depending on switch position. I get that IND-1 indicator is 240 as it is taking in two simultaneous hots.
Thanks.
New to electric brewing but not electricity.
I am using Doug's diagram below on my build.
The SW11's in this diagram are 120volt (not 240) correct? Just double checking - as the switches are taking in a neutral and hot on the lighted indicator but passing through two separated hots on the switch depending on switch position. I get that IND-1 indicator is 240 as it is taking in two simultaneous hots.
Thanks.