Hi guys...I am about 20 hours of labor or so from getting it done. Just wanted to show it to you guys.
Gas needs to be plumbed...switches installed in control box....pump hardwired....copper and kegs polished......etc...I just got my HLT back today from the welders...did a quick mock up of what it will look like with thermometers and sightglasses. I have all stainless valves coming and eventually I will have my brew day!!!!
Thanks to those that have put up with my retarded questions so far...I got many more to follow
:rockin:
Gas needs to be plumbed...switches installed in control box....pump hardwired....copper and kegs polished......etc...I just got my HLT back today from the welders...did a quick mock up of what it will look like with thermometers and sightglasses. I have all stainless valves coming and eventually I will have my brew day!!!!