PleasantValleyHops
Well-Known Member
wubears71 said:On that note, I can pretty much guarantee that a hard wired panel would be considered a "sub-panel" in my municipality, which would require permits.
In that case!! What!! In most counties in the great usa u cant just add a spa panel either. So weather its hard wired direct to ur cp or not. Just bc u throw a plug in there doesnt make it a legal connection. And the insurance issue only comes up if ur control panel caused the fire or was started by an electrical issue in that area of ur panel. Which if u have pwr going to it when ur not around then part of that is just plan stupidity anyways. Turn the breaker off after ur brew day. And i cant stress enough to people that when u say ur nec compliant. Thats like saying. "i only needed a D to pass a test and thats what i got". The nec is a BARE MIN CODE, its there so everything isnt completely ghetto rig. People get so caught up in "The Code". How bout if u dont know what ur doing hire someone that does so u dont F something up and hurt or kill urself or worse others! Man i need a beer now!!!
Sorry for going on a rant but dumb people and stuff bother me