I have three banjo burners that are 210,000 btu's each. I am getting black steel tube for the gas line and the. I want to come off the t's with the plastic yellow flexible gas line. But it looks like the 3/8" hose is only rated for 33,400 btu's per hour. Is this going to be a problem?