kcinpdx
Well-Known Member
Hi all. I was considering upgrading my electric service in my garage to accommodate a 4 element system in which all 4 elements could be on at the same time. Then I got to thinking, what’s the point? Even in a back to back situation, it would not be necessary for all 4 to be on at the same time at full power. Am I missing something? Is there any advantage at all that I’m not seeing?