Next, I installed a CEE outlet (3 phase, 230/400V, up to 32A). I wired it up temporarily to a 10A outlet in the basement for the duration of the build, but once the trench is finished, I will have an electrician wire it up to its own 16A GFCI breaker on the main panel.
(the sticker was...