• Please visit and share your knowledge at our sister communities:
  • If you have not, please join our official Homebrewing Facebook Group!

    Homebrewing Facebook Group

Search results

Homebrew Talk

Help Support Homebrew Talk:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. I

    Show us your element housings/pots. How did you do it?

    I really like the switchcraft solution. Are those rated for 30amp? Any chance you can provide model numbers so I can locate the plugs / connections in their catalog? I'm curious if they are any cheaper than the twist lock plugs. I'm tempted to put in the basic right angle plugs on my control...
  2. I

    e-Brewery Control Panel Project/Conversion from Propane to Electric

    Yes, the StL Brewer's Heritage Festival was great. I enjoyed myself probably a little too much. :drunk: I was disappointed that the city shut down the homebrewers. Last year my favorite brew was a Double IPA one of the homebrewers was serving. So I was really looking forward to talking to the...
  3. I

    2 PID 50a Control Panel Design Check

    P-J, This is perfect. I'll be sure to post pictures of my progress here in case anyone else is wanting to do a similar build. I can't wait to get started. Thanks again. Ryan...
  4. I

    2 PID 50a Control Panel Design Check

    P-J, Your contribution of countless hours dedicated to this community is absolutely priceless. I'm sure a lot of the electric brewers out there would still be on propane if it weren't for you. Thank you for putting this together. This is awesome! The only differences of what I had planned was...
  5. I

    2 PID 50a Control Panel Design Check

    P-J, Thanks so much for taking interest in my post. Yes, I would like to incorporate the key toggle switch for the on/off, but I'm also open to suggestions if it over complicates the build. Rbeckett, I'm just using Visio to mock up the panel layout. Thanks for the compliments.
  6. I

    2 PID 50a Control Panel Design Check

    thanks stlbeer. I think I will reach out to P-J to see if he has anything. Your schematic is really close to what I'm doing. I just need to figure out the timer and alarm part. I've been browsing post here for months now to get an idea of what I want and how to do it and of course have realized...
  7. I

    2 PID 50a Control Panel Design Check

    I'm seeking a wiring diagram for the following two PID + Timer 50amp build PID: Auber SYL-2352 Timer: Auber ASL-51 My plan is to follow P-J's advice and use a SPA panel for the main power feed. I want the PIDS and timer powered on by the main power switch. The elements are switched on by...
  8. I

    Auber timer question

    I'm up in the air over using the SWA-2451 PID versus using a separate timer. I like the idea of having the timer built in, but think it might be a little less intuitive since you are timing the boil from the HLT PID. In regards to the Auber timer, if you are not concerned w/ pausing wouldn't...
  9. I

    2 PID 50a Control Panel Design Check

    stlbeer, Thanks for the feedback. The alarm part of the build is the only thing that is confusing me. I'm not sure the alarm on/off is necessary, but have seen it in similar builds. (I guess I would always want the alarms I set to trigger.) I assumed the reset on the timer would turn the...
  10. I

    2 PID 50a Control Panel Design Check

    I'm hoping to get feedback on the layout and functions of my control panel. My plan is to be able to run 2 - 5500 watt elements along with two pumps at the same time. I want to power on the PIDs with the main power switch. The PIDs I'm using have built-in timers, so I'm including a reset button...
  11. I

    Help with wiring diagram/parts list

    checkout www.ebrewsupply.com They have BCS control panel kits which list the parts along w/ wiring diagrams. This might give you a better understanding of what you need to build a control panel the way you want it using a BCS.
  12. I

    e-Brewery Control Panel Project/Conversion from Propane to Electric

    Nice build thread. The din-rail and wire management looks great. I'm in the planning and gathering stage of my PID ebrew build. So this is my inspiration. Also, I will be at the St. Louis Brewers Heritage Festival. Can't wait to sample the brew you made on the rig. Cheers!
  13. I

    Input needed: eBrewSupply kits?

    I would be interested in a Kal on the outside, maxed out din-rail on the inside kit with the option to deselect items I might already have. For instance I already have the enclosure, contactors and probes. I'm very glad I found your site through this post. Sourcing all the necessary parts can...
  14. I

    Ton of Equipment in TN

    I'm interested in the three perlick faucets and shanks if you part out the keezer.
  15. I

    RTD Sensors

    I'm interested in all three - email sent
  16. I

    Three 5-1/8" Stainless Shanks - $27.50 shipped

    I'm interested. Let me know if 1st falls through.
Back
Top