Thanks - ah, good observation, everything you wrote.
Yeah was thinking maximizing the size of tubing until getting to the QD would maximize throughput but maybe not. Nonetheless, I'm stuck with 1/2" ID barb connectors at the pump, so how to do the step-down? Are SS 1/2" ID to 3/8" ID...