Thanks Lonnie.
We are almost there. Should have some new pics to post asap. Steve has the new Cotrol Box and cond. to run wires through. We have the new brackets installed for the Flame thrower burner on the boil kettle. it was determined that the burner was to high. se we had new brackets made...