It doesn't have to be hooked up directly, you can use hose from the pickup outlet to a pump that's lower down.
On my Unibrau I do have the pump directly attached since that layout works for my setup.
The preexisting floor drain by the washer was backing up. Ended up being clogged with roots between it and the main stack. The main is clear though, we had it scoped during inspection.
Since I was replacing the piping by the washer I decided "what the hell, why don't I just add a floor drain...
Luckily I'm working with an unfinished basement. I installed a floor drain and drain pipe for a sink last weekend.
The room will be 10x13' total with all the plumbing on the 10' wall.
In the attached photo, the kettles will be going in front of the drain and the sink will be to the right...
I'm working on my plumbing plan for my basement brew room and trying to determine how many water outputs I need.
1 hot & cold for sink
1 cold for wort chiller
1 cold for steam condenser
1 cold for RO/DI
Any good suggestions for if more are needed?
Changing my setup around so I have some extra equipment.
Panel has worked great for me, and the riptides are all but new.
Auber 30A eBIAB control panel
- DSPR400 EZBoil controller
- bought it as a plug-and-play, Auber assembled it...
Prices do not include shipping.
Steelhead V2.0 DC pump $60
Was purchased from Northern Brewer
1.5" SteamSlayer w/ both sprayer heads $100
Never ended up using it, do have the tubing somewhere
Anyone know of a 1/32 din display that would work with a rtd pt100 probe?
It does not need to have any kind of control, I just want to display the temp.