r8rphan
Well-Known Member
In order to make my second carboy available for a 10G boil weekend after next, I was thinking of going ahead and transferring the beer after primary is complete (one week into the ferment), and letting it finish fermenting in the corny keg...
Has anyone tried this?
I am thinking of installing a gas out ball lock fitting with either a tube to a small container of star san (miniature blow off) or some sort of rigid tube and air lock assy (supported by the ball lock fitting itself)..
Otherwise, I'll have to wait an additional week to do the brew, and I'd rather get it going as soon as possible...
advice/opinions appreciated...
Thanks
Has anyone tried this?
I am thinking of installing a gas out ball lock fitting with either a tube to a small container of star san (miniature blow off) or some sort of rigid tube and air lock assy (supported by the ball lock fitting itself)..
Otherwise, I'll have to wait an additional week to do the brew, and I'd rather get it going as soon as possible...
advice/opinions appreciated...
Thanks