I know that there are other threads out there, but my question is less about process and more about ensuring that I order all the needed equipment the first time.
I finally get my fridge next Monday, and today I going to order the remainder of what I need to make it into a kegerator. If I miss a part, I am going to be really dissapointed.
So, here goes - tell me what I will be missing.
I already keg my brews and use a picnic tap or my beer engine, so I have most of the stuff already. I have kegs, I have a CO2 tank with a regulator.
In order to put my refrigerator into operation with two kegs running, I will need:
2 faucets
2 shank assemblies
a lot of beer and gas line
Will this get me into operation, or am I not considering something important?
Also, how do I know if I should order 4 1/8 or 5 1/8 shanks.
P.S. I think I am ordering from this page.
I finally get my fridge next Monday, and today I going to order the remainder of what I need to make it into a kegerator. If I miss a part, I am going to be really dissapointed.
So, here goes - tell me what I will be missing.
I already keg my brews and use a picnic tap or my beer engine, so I have most of the stuff already. I have kegs, I have a CO2 tank with a regulator.
In order to put my refrigerator into operation with two kegs running, I will need:
2 faucets
2 shank assemblies
a lot of beer and gas line
Will this get me into operation, or am I not considering something important?
Also, how do I know if I should order 4 1/8 or 5 1/8 shanks.
P.S. I think I am ordering from this page.