Here's a few pictures of my brewing system.
https://www.dropbox.com/sh/v4x3xpdvm708b1z/AABc1BDqpStIYbXLAEBMtxpoa?dl=0
I built the tanks from stainless pipe and welded bottoms on them. I spent countless hours polishing the tanks only to get a somewhat acceptable finish. Next time I would just buy the tanks. I built the frame using 3/16 in wall 1 ½ stainless tubing. I built the control panel out of some used parts but I am pretty happy with how it turned out. The PLC is an Allen Bradley L18-ERM CompactLogix and the touch screen is a Red Lion G307K200. I also use VT SCADA free version to monitor with my PC or smartphone. VT SCADA also has a great historian/trending tool so that I can monitor and record all of my temperatures for each batch. There are a few things that I am going to add. One is another element to my boil kettle. I would like to get it up to temp a little faster. It does ok with 10 gallons but I would like to start brewing 15 and 20 gallon batches. I also want to add another flow meter from the mash tun to the boil kettle for measuring boil volume. I have an IMF magnetic flow meter to measure my strike/sparge water and it works very well. I also used a single phase output VFD to control the speed of my Chugger pump on the wort side. I vary the speed with a PID loop in the PLC to maintain a constant output temperature on my chiller. I still have plenty of work to do to the system like making lids for the tanks and welding on some mounting brackets for the chiller and the pumps. It helps that we have a waterjet at work with a ton of scrap stainless. I have brewed four batches with the system so far and I love it. Please let me know if you have some suggestions for improvements.
https://www.dropbox.com/sh/v4x3xpdvm708b1z/AABc1BDqpStIYbXLAEBMtxpoa?dl=0
I built the tanks from stainless pipe and welded bottoms on them. I spent countless hours polishing the tanks only to get a somewhat acceptable finish. Next time I would just buy the tanks. I built the frame using 3/16 in wall 1 ½ stainless tubing. I built the control panel out of some used parts but I am pretty happy with how it turned out. The PLC is an Allen Bradley L18-ERM CompactLogix and the touch screen is a Red Lion G307K200. I also use VT SCADA free version to monitor with my PC or smartphone. VT SCADA also has a great historian/trending tool so that I can monitor and record all of my temperatures for each batch. There are a few things that I am going to add. One is another element to my boil kettle. I would like to get it up to temp a little faster. It does ok with 10 gallons but I would like to start brewing 15 and 20 gallon batches. I also want to add another flow meter from the mash tun to the boil kettle for measuring boil volume. I have an IMF magnetic flow meter to measure my strike/sparge water and it works very well. I also used a single phase output VFD to control the speed of my Chugger pump on the wort side. I vary the speed with a PID loop in the PLC to maintain a constant output temperature on my chiller. I still have plenty of work to do to the system like making lids for the tanks and welding on some mounting brackets for the chiller and the pumps. It helps that we have a waterjet at work with a ton of scrap stainless. I have brewed four batches with the system so far and I love it. Please let me know if you have some suggestions for improvements.