fiveohmike
Well-Known Member
Hey Guys,
All my kegging equipment showed up (along with all the taps/lines/ect to build my keezer)
However my freezer wont be here for a week or so (plus the time building the collar).
I want to brew this weekend and keg my first beer, however it would have to be stored at room temp (~65-72 degrees).
Is this going to be ok for a week or two while I build the keezer out or should i just completely hold off?
its just hard....sitting here....with brew ingredients....and kegging equipment.... if you know what I mean lol.
All my kegging equipment showed up (along with all the taps/lines/ect to build my keezer)
However my freezer wont be here for a week or so (plus the time building the collar).
I want to brew this weekend and keg my first beer, however it would have to be stored at room temp (~65-72 degrees).
Is this going to be ok for a week or two while I build the keezer out or should i just completely hold off?
its just hard....sitting here....with brew ingredients....and kegging equipment.... if you know what I mean lol.