dandanbeer
Member
- Joined
- Sep 8, 2012
- Messages
- 8
- Reaction score
- 4
As stated above, I am in desperate need to an existing schematic for the EHERMS setup I have. I have done so many sketches I feel like I'm about to lose my mind. The least number of 3-way ball valves for the design is currently at 5, given the way I'd like to do it. This is what makes it tricky.
I have no desire to use a plate chiller given my local water supply's levels of calcium in the water. The amount of beerstone I have to deal with is pretty heavy and the amount of maintenance to flush it out is a little more than I'd care for. I'd like to be able to use the HERMS coil to do the chilling.
I have the pretty standard 3 keggle, single-tier, 2 March pump setup with camlocks. That's pretty much it. Anyone else do this or know of a previous thread that I can look through? Maybe one with a nice manifold design to keep it all in front of the kettles?
Thanks and Cheers!
I have no desire to use a plate chiller given my local water supply's levels of calcium in the water. The amount of beerstone I have to deal with is pretty heavy and the amount of maintenance to flush it out is a little more than I'd care for. I'd like to be able to use the HERMS coil to do the chilling.
I have the pretty standard 3 keggle, single-tier, 2 March pump setup with camlocks. That's pretty much it. Anyone else do this or know of a previous thread that I can look through? Maybe one with a nice manifold design to keep it all in front of the kettles?
Thanks and Cheers!