O.K. So I thought I had seen a pic a few days back while surfing the interwebs that showed either a design or actual built Dual-3-Tier/gravity Brew Stand. A few days later and now my interest is peaked!!!! I want to build it.
If I remember correctly, it was a 3or4" post for the middle beam that had 2 shelves at each level instead of one. 2 for Mash Tun and 2 for Brew Kettles/Keggles being fed by a single tank up top supplying the sparge water for both. Yes, it could have 2 top tanks, but 1 would be good.
Mount your burner/stand/shelf as the highest part of the brew stand and your 2 MT shelves below that. Then below that, 2 more shelves with burners below them for the boil.
10 gallons just turned to 20 gallons on the same stand, at about the same amount of time.
Does anyone happen to have a pic or a link or a design that they have that you could post here. I'm going to do what I can to design one up, but an example or 50 would really help.
Thanks in advance!!!
If I remember correctly, it was a 3or4" post for the middle beam that had 2 shelves at each level instead of one. 2 for Mash Tun and 2 for Brew Kettles/Keggles being fed by a single tank up top supplying the sparge water for both. Yes, it could have 2 top tanks, but 1 would be good.
Mount your burner/stand/shelf as the highest part of the brew stand and your 2 MT shelves below that. Then below that, 2 more shelves with burners below them for the boil.
10 gallons just turned to 20 gallons on the same stand, at about the same amount of time.
Does anyone happen to have a pic or a link or a design that they have that you could post here. I'm going to do what I can to design one up, but an example or 50 would really help.
Thanks in advance!!!