I usually brew two batches on brew day so am thinking about adding a whirlpool vessel to my Blichmann top-tier in order to allow more overlap in the batches. I often do hop stands, so that's part of the timing factor.
Currently on the stand: HLT, cooler tun, BK, RIMS tube, pump, control box. Gravity flow from one vessel to next. The pump is only for mash temp control and I'd prefer not to add another pump.
I'm trying to decide on a new layout that includes a whirlpool vessel. Is there anyone that has done this -- 4 vessels on a top-tier? I'd like to see what others have done before I rebuild my brew stand.
Currently on the stand: HLT, cooler tun, BK, RIMS tube, pump, control box. Gravity flow from one vessel to next. The pump is only for mash temp control and I'd prefer not to add another pump.
I'm trying to decide on a new layout that includes a whirlpool vessel. Is there anyone that has done this -- 4 vessels on a top-tier? I'd like to see what others have done before I rebuild my brew stand.