75% complete all electric herms brewing system 800$
Bethlehem pa
included
3 converted 15 gallon keggles
only thing missing on keggles is the boil kettle sight glass and element install
all valves are present, washers, gaskets and male disconnects
plugs are complete for both elements and just need to be wired
brand new in box center input ss chugger pump
chill plate
one sight glass
inkbird thermostat for fermentation chamber
inkbird thermostat for keggerator freezer conversion
steel table
5 3 gallon kegs cleaned and sealed
1 5 gallon keg cleaned and sealed
2 co2 tanks with regulator one tank is filled
2 6 gallon carboys one is glass etched with gallons
all equipment needed for fermentation/testing
a bottle tree, bottle cleaner, carboy dry stand
carboy gurny for moving
various equipment for dispensing, cleaning
value given to each object
three converted keggles with herms installed and false bottom with valves-300
5 3 gallon kegs 1 5 gallon keg 125
2 co2 tanks and regulator 100
2 carboys and fermentation, siphoning, cleaning, bottling equipment 100
new pump- 75
new chill plate- 50
all valves, and other hardware- 75
this system was being built off of the electric brewing system i can attempt to send you a digital copy for building guide for electrical and hardware
all that is needed to finish
heating element and valve install and sight glass on boil kettle
hosing and female ends for liquid transfer
possibly another pump
and electrical so panel for element plug in and switches for pumps and heating elements
Have pictures just text me
6105073293
Bethlehem pa
included
3 converted 15 gallon keggles
only thing missing on keggles is the boil kettle sight glass and element install
all valves are present, washers, gaskets and male disconnects
plugs are complete for both elements and just need to be wired
brand new in box center input ss chugger pump
chill plate
one sight glass
inkbird thermostat for fermentation chamber
inkbird thermostat for keggerator freezer conversion
steel table
5 3 gallon kegs cleaned and sealed
1 5 gallon keg cleaned and sealed
2 co2 tanks with regulator one tank is filled
2 6 gallon carboys one is glass etched with gallons
all equipment needed for fermentation/testing
a bottle tree, bottle cleaner, carboy dry stand
carboy gurny for moving
various equipment for dispensing, cleaning
value given to each object
three converted keggles with herms installed and false bottom with valves-300
5 3 gallon kegs 1 5 gallon keg 125
2 co2 tanks and regulator 100
2 carboys and fermentation, siphoning, cleaning, bottling equipment 100
new pump- 75
new chill plate- 50
all valves, and other hardware- 75
this system was being built off of the electric brewing system i can attempt to send you a digital copy for building guide for electrical and hardware
all that is needed to finish
heating element and valve install and sight glass on boil kettle
hosing and female ends for liquid transfer
possibly another pump
and electrical so panel for element plug in and switches for pumps and heating elements
Have pictures just text me
6105073293
Attachments
Last edited: