I am wanting to build an EBIAB system with 240V element to PID controller. I currently have a 8 gauge 3 wire going to electric oven in basement that Im taking out. I want to run the 3 wires into a spa GFCI panel and then into brew controller. I have looked through many posts on this subject and...