For Sale
***If you buy the tower or a regulator I will throw in 1oz of hops!***
Single tap tower used 1-2 months $35 OR $45 with handle.
3 brand new faucets $10 each***1 left***
used tap/shank (has a bit of paint on it should clean up nice) $20 ***SOLD***
NEW shank $10***SOLD***
2 used keg...
I have done this several times, just wait until the krausin is gone and drop it in slowly and carefully as it will want to hit the bottom of the carboy.
It can be a pain because it is NEVER facing the way you want it and it can get "trapped" on the contour of the carboy and not read...
$16 (a glass?) seems higher than Giraffe nuts to me ! I bet that place didn't have much of a dollar menu.:D
However a $3-4 Coffee of some sort is almost a daily thing for me :mug:
They are 3/32
I got to brew on mine today ! :rockin:
The flame was fine it just wasn't what it was on HP.:mad: The next batch will be 10g so we will see how it does with that .
The only problem I had was the temp wasn't calibrated right so I had to compensate about 10*. I need to...
Yea I converted it to Propane and the internal regulator is screwed all the way in.
All of my gas lines are 3/8'' or 1/2'' id
I'll play with it later and maybe post some pics to see if anyone can see a problem.
Dam I was wanting to brew on this thing "automated" this weekend but now it looks like I'll have to order a low pressure regulator from somewhere?
So do I just need to drill out the burner orifices or can you buy a low pressure "jet" for the Banjos?
I have gathered some people drill them...
Ok I have a problem. The gas valve will not open. the pilot light stays lit in the on position and i have 24v to the gas valve but it wont open?
so we are clear it is the same Honeywell 8200 thermostat
The "TR" terminal goes to terminal 14 (24v+) and terminal 13 goes to the positive side...
The control panel wiring. The box I used has a clear back, so this is looking in the back of it:
From left to right:
- 2 x output power modules 110V (pumps)
- 110V Terminating block (top)
- 110V to 24V Transformer, 40VA (middle)
- 24V Terminating block (bottom)
- 2 x SYL-2362 PIDs...
It was pretty good :o you could taste the Cinnamon and Nutmeg but the Pumpkin was very faint and the 1 I had did not have near the head as the Oktoberfest but that may just have been my pouring.
Does it mater if I put my gas ball valve before or after the Honeywell gas valve?
It looks like most are putting the gas ball valve under (before) the Honeywell gas valve but I want to put mine above it (after).
Anyone see a problem with this?