I went with 50 feet of 3/8. The price of copper has gone crazy. I think it cost about 70 bucks. It cools the wert in about 15 minutes. I clamped pvc tubing over the inlet/outlet of the copper and it drips if I turn the water to high. I would recomend soldering hose fittings to avoid this problem.