I would just install a weatherproof loadcenter outside at the end of the run and then you could do whatever you wanted. Leave the 50A 2Pole breaker inside and roll with it, take the conduit loose at the last fitting, pull the conduit off the wire, cut to desired length, put back on wire, get a...