Looking at the bottom LH side of the panel, I installed the power plug, and the Pump #1 plug. Next to that are the QDs for the gas control valves, and the "add water" solenoid valve.
Here is the back side of the plugs.
Then you see the 24 VAC transformer
Then the 120 VAC BUS...