And again, this is built using pex elbows, pex tees, vinyl tubing, shut off valves, and a 2x4. Everything came from Lowes so far except for the fill tubes. Nothing was welded, no copped sweat, only 3 holes need to be drilled and only vinyl tubing needs to be cut. So far anyway.
I forgot about...