Here are the shots from the manual that came with my receptacle. I based my wiring diagram off of this. my controller box works very well. The HE receptacle switch power up the PID and the SSR controls power out of the receptacle to HE. The pump is a secondary receptacle and the switch controls...
Here are the shots from the manual that came with my receptacle. I based my wiring diagram off of this. my controller box works very well. The HE receptacle switch power up the PID and the SSR controls power out of the receptacle to HE. The pump is a secondary receptacle and the switch controls...
That wiring diagram is correct. I plug my box into a wall, GCFI, plug my pump into the box and my heat element into the other side.
The screws are in a different position from some manufacturers of switch plug combos, but I colored them in the correct position from the receptacles that I found...
great post! I am trying to build the countertop version of brutus 20. The difference with this controller and what I am trying to build is that I would like to have an extra switch/plug combo that does not need to be controlled by the PID in any way, just so I can switch the pump on and off and...