1: Start filling HLT and pump strike water to MLT (half filled)
2: Heat HLT and recirk both HLT and MLT until 3-4F above mash temp.
3: Doe in and lower the HLT temp.
Sent from my iPhone using Home Brew
Finally! Everything installed, cleaned and tested.
Not the best overview picture but with these 4 valves I can controll all the flows from filling the MLT from HLT to whirpool and Hx-cooling.
Sent from my iPad using Home Brew
When I first started to build my HERMES I did try without recirculation and It worked ok. It depends on where you meassure the temperature and where the heater is located compared to the coil. I only lost about 2F from the HLT setpoint to the coil out temp, so it was not that bad. Today I use a...
I am really pleased with my present setup, but I have decided to go towards a more automated control system.
The first step will be to install 24v 3-way valves for my pumps. I already have the valves but I'm waiting for some stainless tri clamp conections so I can install everything.
The...
To be honest, I have been lurking here for quite some time before posting, but now it's time!
I'm a process engineer by profession so my brewing tends to be more about the equipment than the actual brewing.
I will start with a post in the automated brewing section.
Skål!
Sent from my iPhone...