Update I just talked to Mike at chugger pumps they were unaware the log on link was still working. He told me that they are working on removing all access point to the accounts now. It still doesn’t make it right when you stated that you deleted the user email addresses and password...
So I just checked the facebook page, it is down. I also logged onto chugger pumps site , and found that I can still access my account. So I went in and changed all my info I suggest everyone else do the same.
Have just informed Chugger pumps that there data has been hacked and user email addresses and passwords have been posted on a facebook site.
If you have placed a order with chugger pumps in the last year and a half and used the same password for other sites you might want to change them.
if...
Here is the end result on the panel until I can locate a reasonable priced 50 amp coil contactor for the main switch disconnect.
Current configuration runs on element at a time.
So I started building a kal version 30 amp control box , and after I cut my holes I changed gears and wired the house for 50 amp. So Im trying to decide if the switchs and element light placement looks good. Also I found an all in one Volt and Amp meter that I'm trying to incorporate in to the...
Yes I'm looking into the price dif now
30 amp CH230GF ($72.00) and 75' of 10/3 ($113)
50 amp CH250GF ($79.00) and 75' of 6/3 ( still pricing put it looks to be $150)
I got my questions answered on Eaton site. The CH230GF is a (5mA) people protection breaker. You can have a feed distance max of 250'
Sounds the simplest to me.
I'm ready to wire in my feed line from the main breaker box , but have a few questions I'm hoping someone can answer.
The distance from my main breaker to where I will be brewing is around 50 to 80 feet.
Option 1# install a CH230GF ( 30 amp 2 pole GFI breaker) with 10/3 wire to a 30 amp rated...