• Please visit and share your knowledge at our sister communities:
  • If you have not, please join our official Homebrewing Facebook Group!

    Homebrewing Facebook Group

Recent content by henryg

Homebrew Talk

Help Support Homebrew Talk:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. henryg

    Difficult to achive boiling on a 500lt kettle

    Finally when i was about to make a hole new propane gas installation i discovered some backstop fittings that were put in my natural gas installation, they were also reducing the gas flow. Now gas flow 3 times power than before! in the future i might change the burners but for now they are ok...
  2. henryg

    Difficult to achive boiling on a 500lt kettle

    quick update. It seams to retain the heat better but although with the 35kw heater it doesn't go up that fast. What do you recommend ? Mod the 35kw to don't loose heat or buy another burner? When i mean mod the burner i mean this Adding an inner metal wall to it.
  3. henryg

    Difficult to achive boiling on a 500lt kettle

    What about the 35kw? Do you have some recommendation pf kw for each kettle? Thanks
  4. henryg

    Difficult to achive boiling on a 500lt kettle

    this is the brewhouse. Direct fire, i have connected it to the gas line. I will post pictures of the brewery soon, i have a little mess going around the place still, finishing this finishing that. I will try with the big burner today for the boil kettle. What do you mean i won't need a burner...
  5. henryg

    Difficult to achive boiling on a 500lt kettle

    Hello fellows i'm testing my brewpub equipment for boiilng times and i having some issues. This are my burners: 2 STAINLESS STEEL GAS BURNERS 26 kW (high power) diameter 560 mm 1 STAINLESS STEEL GAS BURNER 35 kW (high power) diameter 740 mm This are my kettles: Mash / diameter: 930 mm –...
  6. henryg

    I´m opening a brewpub, layout opinions? look some renders

    Hello fellows, finally i dismissed that location, the community didn't let me put the air evacuation tubes til the rooftop of the building. So i found a new one, just in front of that one. This is layout planned. What do you think? I can have a beer garden in the back of the venue. In the...
  7. henryg

    I´m opening a brewpub, layout opinions? look some renders

    Yes de diagonal wall can and will be removed. That will give a little bit more space. The thing is there's not a single good space to rent for a price that worth the penny. There's not a single brewpub in my city, and beer hasn't exploded yet. So demand is not high right now. About the...
  8. henryg

    I´m opening a brewpub, layout opinions? look some renders

    Hello to all and thanks for all your replies after all. After giving it a good thought and having the correct mesures of the floor plan, i have no choice more than put the brewery in the top floor. And although i will be more uncomfortable brewing in the top floor, i have discovered that: A)...
  9. henryg

    I´m opening a brewpub, layout opinions? look some renders

    Spain is really loose. Anyway renders are not as accurate as the should have. I took new messures today. Will update this during tge weekend.All info about batch sizes and equipment answered a post above
  10. henryg

    I´m opening a brewpub, layout opinions? look some renders

    -800kg per square meter -450lt per batch, 4 batchs a month. 1 fermenter 625lt. 12 240 maturators plastic. kegging on demand with blichmann quikcarb. - there´s nothing in the 2nd floor right now. - what do you mean about insurance? This is Spain :ban:
  11. henryg

    I´m opening a brewpub, layout opinions? look some renders

    I won´t mill in the factory, i have a provider that mill it for a bargain. I will store them downstairs behind the stairs, and lift them up with a manual stair climber. I will have a floor drain of course in the 2nd. Agreed about option A. :tank:
  12. henryg

    I´m opening a brewpub, layout opinions? look some renders

    As far as i know, that floor can handle more than 800kg per square meter. I have 3 500lt kettles, planning to do batches of 460. Then fermentor is 625 liter. Water tank 500lt. And maturators 12 x 240lt.This are plastic ones. Total meters of the venue are 93m2, now i have a more detailed...
  13. henryg

    I´m opening a brewpub, layout opinions? look some renders

    Hey, yes, floor can handle heavy weight! :tank:
  14. henryg

    I´m opening a brewpub, layout opinions? look some renders

    Just for the heavy lifting? Space?
Back
Top