• Please visit and share your knowledge at our sister communities:
  • If you have not, please join our official Homebrewing Facebook Group!

    Homebrewing Facebook Group
Homebrew Talk

Help Support Homebrew Talk:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
FRP pebble board has been applied to the wall between the bathroom and kegerator.  Plumbing is finished there with a drain for the sink and water supplies.  Reflectix is in place for the front wall of the bar.  Most parts of the bar have, going from outsi
Moonpile

FRP pebble board has been applied to the wall between the bathroom and kegerator. Plumbing is finished there with a drain for the sink and water supplies. Reflectix is in place for the front wall of the bar. Most parts of the bar have, going from outsi

FRP pebble board has been applied to the wall between the bathroom and kegerator. Plumbing is finished there with a drain for the sink and water supplies. Reflectix is in place for the front wall of the bar. Most parts of the bar have, going from outside in, 1/2" plywood, two sheets of 1 3/8" Dow Super Tuff-R (R-value of 9 for one sheet), one layer of Reflectix and finished with FRP pebble board. Oh, and a LOT of Great Stuff.
There are no comments to display.

Media information

Album
BarBuild
Added by
Moonpile
Date added
View count
466
Comment count
0
Rating
0.00 star(s) 0 ratings

Share this media

Back
Top