  1. #1
    killsurfcity

    Well-Known Member

    Posted Sep 14, 2012
    Some friends of mine and I are partnering together on a 1-1.5bbl system. The budget is not huge, but I think we can pull it off if we make some smart choices.

    One thing I read a lot is that jacketing the mash nearly eliminates the need for HERMS to keep temp in a single infusion mash. So I decided to design my system without RIMS or HERMS, and with only a single pump. This helps us to start on the cheaper end, but we can always add the HERMS coil and control later.

    Thus far I have not seen anyone doing this, so I have a couple questions about the control panel setup.

    With the configuration below, only the BK/HLT will have elements/probe(s). The mash will just use a standard dial thermometer. Or is there a way to incorporate some kind of temp readout for the mash into the panel?

    With two elements, I've heard it's better if one fires full on, and the other is controlled. This way only one will be switching on and off, and you only need one probe. If this is true, how do you set the "full on" element up? Switch + pot? Naturally, I'd want a switch for my pump in the panel as well.

    Other than that, what do you think of this method? Sorry for the really long image. I wanted to draw it all out just to make sure I wasn't missing anything. Thanks!

    [​IMG]
     
  2. #2
    RichBenn

    Well-Known Member

    Posted Sep 14, 2012
    Sure. Either use another PID with an RTD or thermocouple, but don't hook up any output, or just get a cheap indoor/outdoor temperature guage and put the sensor in a thermowell. If doing degrees C, get a cheap ebay temperature controller.
    You only need one probe anyway. A PID will control two SSRs (actually, more), and it will pulse both of them together to get the power level you desire. Make sure it has a manual mode, as that's what you want for boiling.
    Kind of interesting. I thought about something like this for my 120V system. Since 1 element is not enough power at 120V, I needed two 120V circuits and two heating elements, so I thought having only one vessel for heating would be nice.

    But I wound up using both a boil kettle and a HLT, so four heating elements(2 for each), 2 PIDs and 2 RTDs. I used ebay (Chinese) components rather than Auberin, so I saved a few bucks.

    In your case, I would think the pots are the real cost. Also, I wonder about keeping real hot water in the plastic tank without insulation will work. You want to be sparging at 170F, and it could loose temperature during the mash. That's part of the reason I went with a kettle for my HLT - I batch sparge, and typically transfer boiling or near boiling water to achieve mashout(raise the 152F grain/water to 168). 212F/100C is right at the limit for HDPE, so I didn't want to go there.
     
  3. #3
    killsurfcity

    Well-Known Member

    Posted Sep 14, 2012
    Ah, I have heard that before I think. Cool, well 2 PIDs, 1 probe it is. Good call on the cheap digital thermometer idea too. I could just hack one appart and mount it in the control box if I wanted to.

    If manual mode is what it sounds like, that makes sense, but wouldn't it make more sense to just use a PWM for one element? That way, when I want to boil I turn the PWM element all the way on and set my setpoint on the PID. If It looks like I may boil over, I can easily just turn the PWM knob to a lower point to reduce the heat from that element. Or am I misunderstanding something?

    I already own two 55g SS drums, so that's not a consideration at this point. It was like $300 for the two!

    Well, the only liquid that will ever in the HDPE drum will be wort, at between 150 - 170. Mash liquid always comes directly from the BK/HLT, so no worry about much temp loss there. One possible improvement would be to jacket both the BK/HLT and GRANT in something so temps are reached faster.
     
  4. #4
    killsurfcity

    Well-Known Member

    Posted Sep 15, 2012
    O, so I've been mulling this over and doing research. It looks like the PIDs that P-J recommends are pretty easy to put into manual mode, and control is at the push of a button. At this point, I'd rather go with one of his diagrams, and save myself the trouble of reinventing the wheel. I'm sure I could always modify things down the road if I need to. So I think I'm going to go with this, and just add another element to the SSR.

    I figure boil process will just be switching to manual mode, at 100% until hot break and the backing off to 75% and adjusting from there.

    [​IMG]
     
  5. #5
    RichBenn

    Well-Known Member

    Posted Sep 17, 2012
    Ok, I lost you with the 2 PIDs. I said two SSRs can be controlled with one PID. The one PID can control two SSRs, one SSR for each heater element. So if you need more than one heating element in a given kettle, then you have one PID, one RTD, and two (or more) SSRs. You always have to have a 1:1 relationship between probe and PID, however.

    Although you can just use a PWM to boil (again, with as many SSRs as you need), the advantage of a PID is you can program it to just below boiling, go away, and have it ring an alarm when it hits temp. When you get back, just change to manual mode and start using % to get the boil level you like. That way you don't have to constantly monitor it, having to worry about boil over if you leave the room. A great feature, IMHO.
     
  6. #6
    killsurfcity

    Well-Known Member

    Posted Sep 17, 2012
    Yeah, sorry I had a brain fart there. I meant a single probe for both elements. The rest of what you said makes sense. The PWM would end up being not much more useful than the pID anyway, and the PID requires less wiring of course, so I think I'm sold.
     
  7. #7
    jpoder

    Well-Known Member

    Posted Sep 20, 2012
    Why not use your "Grant" as a HLT? wouldn't it be easier to pump hot water from your kettle into that tank and pump wort (first runnings) into the kettle? that way you really only have to clean the kettle and the MLT, not the 3rd vessel as it only held water. sure, you may want to insulate it a bit, but once you have your system dialed in you can estimate the temp loss and compensate for it.

    Check out the thread on "Kevin's e-brewery build" http://www.homebrewtalk.com/f170/kevins-e-brewery-build-292314/index3.html He has a diagram of what I'm talking about.
     
  8. #8
    killsurfcity

    Well-Known Member

    Posted Sep 20, 2012
    Yeah, good point. I've been thinking about that as well. With proper jacketing, and keeping track of temp loss, we could dial it in no problem. That would allow us to start heating the wort sooner as well. Hmm... might need to change those diagrams. ;)

    That's a great thread. What a cool little system.
     
  9. #9
    killsurfcity

    Well-Known Member

    Posted Sep 21, 2012
    Ok, I revised the drawing based on jpoder's suggestion. Working out the diagram it seems like a pretty elegant process, for being somewhat less efficient than one which incorporates more elements/pumps.

    [​IMG]
     
  10. #10
    killsurfcity

    Well-Known Member

    Posted Oct 2, 2012
    So, I'm going to need 2 5500W elements in the BK. What should I ask the electrician for power-wise? I don't speak high voltage. ;)
     
  11. #11
    killsurfcity

    Well-Known Member

    Posted Oct 2, 2012
    Also, anyone have a drawing like the above schematic, but showing 2 elements? Thanks
     
  12. #12
    killsurfcity

    Well-Known Member

    Posted Oct 2, 2012
    perhaps i need a new thread title... or more pics? i got some naked pics of 55g ss drums... eh eh?
     
  13. #13
    P-J

    Well-Known Member  

    Posted Oct 3, 2012
    Post what you are trying to achieve. Are you going to run 2 kettles - HLT and BOIL? Independently or back to back? I also need to know the power that you will have available (240V @ 30A? 50A? 60? 100A?) What about GFCI protection? (This one is critical.)

    I have bunches of diagrams that I've drawn. Some are close but none fit -yet-.

    Let me know.

    P-J
     
  14. #14
    killsurfcity

    Well-Known Member

    Posted Oct 3, 2012
    The second process diagram on the first page shows the gist, but for the sake of clarity, I'm using the BK as the HLT, so only one vessel in my setup will be heated with an element. However, that vessel is 1.5bbl, so I need more than one element. From reading around, apparently it's doable with 2 5500k elements. Power is 240V 50A. Definitely want GFCI protection. Thanks! Let me know if I can clarify anything.
     
  15. #15
    killsurfcity

    Well-Known Member

    Posted Oct 5, 2012
    BUMP, for progress!
     
  16. #16
    P-J

    Well-Known Member  

    Posted Oct 6, 2012
    Bump, for information!


    And it Does Not come close to a clue for me.
     
  17. #17
    killsurfcity

    Well-Known Member

    Posted Oct 6, 2012
    I thought my response to you was pretty clear, but I'll try again...

    No, 1 kettle will serve as HLT and BOIL. It will use 2 5500w elements.


    240V @ 50A

    I want to have it.
     
  18. #18
    P-J

    Well-Known Member  

    Posted Oct 6, 2012
    As always - Click on the image to see a full scale diagram that is printable on Tabloid paper (11" x 17")

    [​IMG]
     
  19. #19
    killsurfcity

    Well-Known Member

    Posted Oct 6, 2012
    Beautiful! Thanks!
     
  20. #20
    P-J

    Well-Known Member  

    Posted Oct 6, 2012
    Welcome. I sure hope it fits your needs and your brewery plan. I had to draw that one from close to scratch.

    I guess there is some benefit with me waking up at 4:30 in the morning...
     
  21. #21
    killsurfcity

    Well-Known Member

    Posted Dec 10, 2012
    Finally got all of my components together, and I'm getting ready for the build. Any good resources out there on how to build these things? I was looking into having an electrician do it, but i'm having trouble finding one.
     
  22. #22
    jCOSbrew

    Well-Known Member

    Posted Dec 10, 2012
  23. #23
    ScubaSteve

    Well-Known Member

    Posted Dec 11, 2012
    You're right on track. This is the process I'll be using, albeit a bit smaller. A couple things...the 5500w elements will pull 30A each. If you want to run 2, you're gonna need 60A total. Rather than a single high amp line, it's easier to control 2 smaller ones. Be sure you're wiring is 10AWG and that your breakers can handle 30A. You will only need both elements for getting to temp, then the single one can handle the boil. You will want insulation on everything.

    Chilling may be an issue too. Did I miss what kind of chiller you're using? An IC becomes impractical at this size. CFC is probably best....plates can clog and you don't want to fiddle with a clogged filter sitting under 30 gallons of boiling wort!

    Lastly, get rid of the HDPE grant and go to stainless. You don't want plasticky off flavors ruining 30+ gallons of beer. Besides that, it gets soft and who knows what will happen with that much hot wort pressing against the sides. You can get away with a smaller grant since it's not the full volume....a sanke (or two) might work in a pinch.
     
  24. #24
    duckdogs

    Well-Known Member

    Posted Dec 11, 2012
    Little late but this is a Diagram P-J drew up for my system that's the same size as the OP.

    Pannel wireing updated 4 ssr's Auberin-wiring1-a11b-RM-SYL-2352-5500w.jpg
     
  25. #25
    killsurfcity

    Well-Known Member

    Posted Dec 11, 2012
    Yeah, got 2 50A lines put in.

    Good to know, thanks.

    So, due to trying to do this on a budget, we decided to eliminate HERMS at least until we decide we need it. So there's no coil in the BK, and no device to maintain mash temp. We're going to rely on insulation and thermal mass to maintain temp. For chilling, CFC. Based on my research, nothing else is going to be as effective for the price.

    Since the initial drawings were done, we've acquired an additional 3 stainless 55g drums. So now everything is stainless. And I'm thinking of thermal wrapping and wood cladding everything, to make the best use of energy/maintain temps better.
     
  26. #26
    killsurfcity

    Well-Known Member

    Posted Dec 11, 2012
    Thanks, but I do have a diagram from P-J (I think on pg. 2) . Mine is more minimal than yours, as our "HLT" does not have any elements in it. We're just going to pump hot water from the BK to the HLT for sparge. Once we know what the temp drop is over time, we should be able to ensure the water in the HLT is always hot enough.

    I've built loads of stuff from schematics before (varying degrees of success of course), but never with high power stuff, which is why I'm nervous. I also want to avoid making dumb noob component layout mistakes, because I'm new to this kind of building.
     
  27. #27
    jeffmeh

    Well-Known Member

    Posted Dec 11, 2012
    If you have 50a breakers, 10 ga wire is not sufficient. I believe you need to run 6 ga wire. The prior comment was that if you used two 30a breakers (rather than one 60a), each of those could use 10 ga wire.
     
  28. #28
    killsurfcity

    Well-Known Member

    Posted Dec 12, 2012
    ok, thanks. i need to verify exactly what the service is before building then i guess. it's in a rented space and the landlord set it up. hopefully it will be usable as is.
     