Building new stand, changing plan from propane to electric and need help | HomeBrewTalk.com - Beer, Wine, Mead, & Cider Brewing Discussion Community.

Homebrew Talk

Help Support Homebrew Talk by donating:

  1. Dismiss Notice
  2. We have a new forum and it needs your help! Homebrewing Deals is a forum to post whatever deals and specials you find that other homebrewers might value! Includes coupon layering, Craigslist finds, eBay finds, Amazon specials, etc.
    Dismiss Notice

Building new stand, changing plan from propane to electric and need help

Discussion in 'Electric Brewing' started by vaheel, Jan 14, 2012.

 

  1. #1
    vaheel

    Well-Known Member

    Posted Jan 14, 2012
    So, I am ready to begin on a new brew stand next week. I brew 5 gallon and want to move up to 10 gallon batches. The original plan was to base the design on SouthernYankee's single tier propane, however a few days ago I started thinking that I woule really like to have the ability to brew indoors and started reading about electric set-ups and would like to go this route if at all possible with a reasonable expense. I have an open 30A breaker that I can run wiring to a GE Spa box in my basement. I have read a lot on the electric brewery and its awesome, just out of my price range.

    Goal:
    Begin with a basic electric system that I can expand to a three vessel system without having to re-buy or replace parts as I expand.

    Here's what I have now:
    Two keggles for HLT and BK
    Coleman Xtreme for MLT (eventually plan on replacing with another keggle)
    1 1/2" steel for brew stand

    Here's what I am thinking I need for electric:
    Convert HLT to ekeggle (weldless element using POL's design) 5500W
    Convert BK to ekeggle (weldless) 4500W
    pump(s)
    GE Spa Panel for GFCI
    30A outlet (3 wire or 4 wire, not sure)
    Temp module?
    Control panel-this is where I need the most help and basically clueless. Can anyone suggest parts needed? I know I am asking alot, just need some help and direction.

    Thanks!
     
  2. #2
    wadefisher

    Brew Meister  

    Posted Jan 14, 2012
    ???? "not" ??

    if $$$ is holding you up consider using multi-tier. uses less pumps. I find it simpler. Just my opinion.
    Try to make it 4 wire. If you are running a new circuit then 4 for sure.
    Search this forum and read alot this can help you more than anyone telling you what you want, need or can afford.
    You can go very simple, which is usually less $$, or go with all the bells and buzzers you want.
    Find your happy median.
     
  3. #3
    vaheel

    Well-Known Member

    Posted Jan 14, 2012
    Thanks for the reply!

    The "not" was a typo on my part. I am reading and learning more as I go. I really can't see reason not low go electric.
     
  4. #4
    vaheel

    Well-Known Member

    Posted Jan 15, 2012
    Do I need two PID's for the BK and HLT ekeggle or just one?
     
  5. #5
    P-J

    Well-Known Member  

    Posted Jan 15, 2012
    You are running on a 30A circuit. You only need to have one PID. Switching allows you to maintain control of you system and its process.
     
  6. #6
    vaheel

    Well-Known Member

    Posted Jan 18, 2012
    Thanks for the reply P-J!

    So with one PID I would need to switch between the elements. If I used two PID's could I run both elements at the same time? Would this need a larger circuit?
     
  7. #7
    P-J

    Well-Known Member  

    Posted Jan 18, 2012
    With a 30A-240V circuit, you will only be able to run a single kettle at one time (HLT or BOIL). If you provide a 50A-240V circuit, you can run 2 kettles at the same time (HLT and BOIL). This would require that you to have 2 PIDs. With that setup you can do back to back batches. If you do not intend or want to do back to back brew sessions, save your money and just use a single PID.

    Hope this makes sense and helps you.
     
  8. #8
    vaheel

    Well-Known Member

    Posted Jan 18, 2012
    Thanks again P-J! This helps me out alot. Have you designed a wiring diagram for this type off set-up before?
     
  9. #9
    Brickout

    Well-Known Member

    Posted Jan 18, 2012
    Check out PJ's diagram here. It's about as simple and inexpensive as you can get. It's pretty much what I'm modeling my system off of.
     
  10. #10
    vaheel

    Well-Known Member

    Posted Jan 18, 2012
    Thanks Brickout! How faar along are you in your build?
     
  11. #11
    P-J

    Well-Known Member  

    Posted Jan 18, 2012
    I've designed and posted a bunch of diagrams for a lot of different designs and setups. Once you decide what you want to do - Please - let me know and I'll try to develop one for your specific situation.

    Wishing you the best.

    P-J
     
  12. #12
    Brickout

    Well-Known Member

    Posted Jan 18, 2012
    Oh I've got a loooonng way to go. I'm still ordering parts. My planning/build thread is here. I modified one of your diagrams to suit my needs. I'm pretty sure I've got it figured out.
     
  13. #13
    JRems

    Well-Known Member

    Posted Jan 18, 2012
  14. #14
    vaheel

    Well-Known Member

    Posted Jan 18, 2012
    Thanks again P-J! I will be in contact soon.
     
  15. #15
    vaheel

    Well-Known Member

    Posted Jan 18, 2012
  16. #16
    vaheel

    Well-Known Member

    Posted Jan 20, 2012
    I would like to use some type of illuminated switches, but have no idea what I need to look for. Can someone please give me info on what I need to look for?
     
  17. #17
    Brickout

    Well-Known Member

    Posted Jan 20, 2012
    Check out The Electric Brewery It pretty much spells it all out for you.
     
  18. #18
    P-J

    Well-Known Member  

    Posted Jan 21, 2012
    I just responded to your PM with switch info for you. Once you decide, please let me know and I'll set up a wiring plan for you.

    P-J
     
  19. #19
    vaheel

    Well-Known Member

    Posted Jan 21, 2012
    I just read your pm. Thanks again for all of your help, I greatly appreciate it. I have learned so much over the past couple of weeks and still have a very long way to go.

    We have just started wedling my brewstand and I will contact you in the next week or so.
     
  20. #20
    vaheel

    Well-Known Member

    Posted Feb 5, 2012
    So the stand is almost finished, just need to add the casters.

    I have purchased a fiberglass enclosure with back plate and a spa panel. I am in need of a wiring diagram and just need to confirm what kinds of switches I will need so that I can get a few more things ordered.
     
  21. #21
    Yooper

    Ale's What Cures You! Staff Member  

    Posted Feb 5, 2012
    Send PJ a PM and he'll help you out. He's "good people"!
     
  22. #22
    vaheel

    Well-Known Member

    Posted Feb 5, 2012
    Thanks! I sent him a pm.
     
  23. #23
    vaheel

    Well-Known Member

    Posted Feb 12, 2012
    I haven't heard anything from P-J, so I figured I would repost to see if anyone else may be able to point me in the right direction. Any suggestions would be appreciated.
     
Draft saved Draft deleted

Share This Page

Group Builder