• If you have bought, sold or gained information from our Classifieds, please donate to HomeBrewTalk and give back.

    You can become a Supporting Member which comes with a decal or just click here to donate.

Georgia Start of Electric Panel

Homebrew Talk - Beer, Wine, Mead, & Cider Brewing Discussion Forum

Help Support Homebrew Talk - Beer, Wine, Mead, & Cider Brewing Discussion Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Status
Not open for further replies.

ABrewHasNoName

Active Member
Joined
Jul 12, 2015
Messages
37
Reaction score
1
*Edit 8/13 - Added more items to include in sale, look in comments below

Start of Electric Brewery Control Panel
This was a complete 30 Amp system that I took parts from to start upgrading to a larger 50 Amp. I'll add more pictures as I can get them, and may add more parts to the list as I update it (without increasing price).

Looking to get $280 including UPS Ground shipping to CONUS.

1 - Pre-Cut (same holes as Kal's panel) Enclosure w/ back plate
1 - Keyed enclosure lock
1- 30Amp Dryer Outlet
1 - Sestos Timer
1 - REX-C100 PID
1 - Red Flashing LED Light/Buzzer
1 - Reset Button
1 - 2-way Switch
1 - Doorbell Transformer
2 - EBrew Supply 40amp SSR
1 - Large Heat Sink (8.75" x 2.75" x 1 3/8")
1 - 3 1/2" Volt Meter
1 - Panel Mount Fuse Holder For 5x20mm fuses
1 - LM317 In DC or AC 4V-30V Out DC 2.5V-27V 1A Converter
3 - 30A DPDT GENERAL P. POWER RELAY 120v AC COIL
1 - Safe Interlock Relay w/ base
1 - 8 Position Dual Terminal Strip
1 - BRYANT 71430MB - LOCKING FLANGED-INLET, 30A (power in)
1 - 30 Amp female locking plug (power in)
1 - 50 Amp Shunt
1 - Roll Steel Wire (for sensors)
1 - Small roll blue braided tubing
1 - small roll black braided tubing
4 - NC Contactors
1 - NO Contactor
1 - 4' 30Amp 4-Prong Dryer Cord


Here is a video on my instagram. Don't mind the look of the panel at the time, it was when I started tearing it apart to upgrade:
https://instagram.com/p/0fzmMykXvR/?taken-by=goldenislesbrewsupply

control panel.PNG
 
Last edited:
What type of system was this set up for and why were you changing it to a 50amp? Where is it in the process and what is needed for it to be completed? Or what is needed to change it back?
 
Im interested if its able to go back to a 30 amp.....
 
Same question as the above poster. Where is this in the build process, what is needed to complete it to a working 30A unit, and what was the reasoning behind needing a 50A unit?

Don't yet know enough about electric brew builds as I'm only just starting to look at going that direction.
 
2 - PIDs
5 - 2 way switches
1 - 3 way switch
1 - keyed 2 way switch
2 - 110v Green Led panel light
2 - 220v Yellow Led panel light
1 - 110v Blue Led panel light
1 - doorbell transformer
1 - DC converter
1 - Amp meter
2 - 110v 15a locking outlets
2 - 220v 30a locking outlets
3 - XLR male panel outlets
1 - dual row 8 position terminal strip

I believe that is all for the control panel, not including wiring of course
 
Being that this has a different layout, could it be wired following the directions from theelectricbrewery.com?
 
It's the same layout, just slightly smaller box. When I had it operational I followed his steps go get it up and running
 
Status
Not open for further replies.
Back
Top