So I ended up going fully DIN just by chance. Turned out most of what I purchased had DIN mountability, and the one or two things that didn't, I got an adapter plate for. I ran 3 rails horizontally across the back plate, and then played the Jenga game of trying to get things to fit logically and clear all the stuff in the door.

To me, the advantage of the DIN was clear when it came to that layout game. I drilled 9 holes in my backplate TOTAL - 3 screws for each rail. From there, I had almost unlimited flexibility in how things got laid out. If you were to go with the standard mount option, you'd have to drill 2-4 holes in your backplate for each device, which winds up being a TON of holes and drilling and is really just an epic pain in the ass.

Now that everything is laid out, I do have the ability to swap out components if anything should fail, but otherwise there's no real post-completion advantage to the DIN rails - they don't do anything for you once the system is finished and is up and running.

If I had to do it again, I would absoloutely go DIN. I'll try and post photos this weekend.

-Kevin
__________________
Building a Bad News Brewery - eHERMS

2014 - 70gal
2015 - 72gal

ClaudiusB Likes This 
Reply With Quote
Old 11-29-2013, 02:46 PM   #32
processhead
 
processhead's Avatar
Recipes 
 
Oct 2007
Nebraska
Posts: 791
Liked 131 Times on 102 Posts


Yeah the DIN rail really simplifies panel fabrication.

It would take a lot more effort to layout all those individual mounting holes and have everything come out straight and square.

The more complex your project, the greater the advantages of rail-mounting components.
__________________
How hard can it be?

 
Reply With Quote
Old 11-30-2013, 11:56 AM   #33
ReuFroman
 
ReuFroman's Avatar
Recipes 
 
Oct 2011
Fort Collins, CO
Posts: 240
Liked 11 Times on 10 Posts


I think the thing that I find to be the hardest is the depth piece I had to almost do a 3D drawing to figure it out.
PID controllers are deeper than I first thought.
__________________
--------------------
It's ok to stare at my kegs! Just don't touch them!

 
Reply With Quote
Old 12-06-2013, 11:39 AM   #34
ReuFroman
 
ReuFroman's Avatar
Recipes 
 
Oct 2011
Fort Collins, CO
Posts: 240
Liked 11 Times on 10 Posts


Quote:
Originally Posted by processhead
The more complex your project, the greater the advantages of rail-mounting components.
This is gold. I think I have a great panel to work with but it is complex.
In the end I think it will be short runs fit around components that are deep.
__________________
--------------------
It's ok to stare at my kegs! Just don't touch them!

 
Reply With Quote
Old 12-09-2013, 06:00 PM   #35
LandoLincoln
HBT_SUPPORTER.png
 
LandoLincoln's Avatar
Recipes 
 
Feb 2011
Joliet, IL
Posts: 2,989
Liked 1115 Times on 588 Posts


Quote:
Originally Posted by kenh View Post
OK, it's the brackets the parts are mounted on. This seems like a expensive way to go. You have to buy the brackets then you can only mount what fits on the brackets.
The brackets are pretty cheap. I think it was five bucks for a three foot section - way more than I needed for my control panel.

For me, it was hard to find certain components that weren't DIN-mounted. Like the mini circuit breakers. So since I was mounting a DIN rail for my mini circuit breakers, I decided to buy some other DIN-mounted components to save space and to make it look nicer.

Other components I didn't DIN-mount, like my contactors.
__________________
www.jolietbrewersguild.org

 
Reply With Quote
Old 12-12-2013, 02:44 AM   #36
MadGus
 
MadGus's Avatar
Recipes 
 
Dec 2008
Richmond, Virginia
Posts: 133
Liked 5 Times on 4 Posts


+1 on PID depth. Make sure you aren't mounting them over top of the contactors on your backplate/DIN rails.
__________________
Primary: Liberal Wheat 5.14
Secondary: Air
Bottle Conditioning: Gingerbread Stout 12.13
Kegged: IPA 3.14, Gluten Free Dos-Equis Clone 1.14
Commercial Tap: Legend Brown Ale
In Bottles: Hopslam, eSCB Holiday Ale 8.13

On Deck: Bourbon Cru 6.14

Gallons in 2014: 33

 
Reply With Quote
Old 12-13-2013, 01:39 PM   #37
ReuFroman
 
ReuFroman's Avatar
Recipes 
 
Oct 2011
Fort Collins, CO
Posts: 240
Liked 11 Times on 10 Posts


Quote:
Originally Posted by LandoLincoln
The brackets are pretty cheap. I think it was five bucks for a three foot section - way more than I needed for my control panel. For me, it was hard to find certain components that weren't DIN-mounted. Like the mini circuit breakers. So since I was mounting a DIN rail for my mini circuit breakers, I decided to buy some other DIN-mounted components to save space and to make it look nicer. Other components I didn't DIN-mount, like my contactors.
I found everything that can be din mounted. There are a lot of components that come din mountable and if they don't there are a lot of brackets that you can use. ebrewsupply.com has almost everything.
__________________
--------------------
It's ok to stare at my kegs! Just don't touch them!

 
Reply With Quote
Reply
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Using A Retired Service Panel For A Control Panel kgalle Electric Brewing 2 04-25-2012 11:52 AM
What guage wire from main panel to spa panel? AdamCanFly Electric Brewing 22 02-01-2012 03:36 AM
Spa Panel or this...? TravelingBrewer22 Electric Brewing 4 12-15-2011 03:06 AM
Mounting spa panel guts in control panel kevink Electric Brewing 7 08-20-2011 02:31 AM
panel to spa panel wiring buffalobrewer Electric Brewing 4 11-29-2010 12:06 AM


Forum Jump